Stafford Township Administrator Matthew von der Hayden was on rumor control last week after some questions surfaced on social media regarding a potential sewage leak in the lagoons of Beach Haven West during the multimillion-dollar sanitary sewer replacement, now in Phase 4 of what will likely be a 10- to 15-phase project. Von der Hayden said all safety criteria for the job are being satisfied.

“How is P&A Construction allowed to use perforated pipe while doing temporary sanitary sewer connections, allowing both…