In another effort to alleviate nuisance flooding, new tie valves are expected to be installed in different areas of Ship Bottom, including in the oldest section of the borough where back-bay flooding remains problematic despite relief measures already in place.

Tie valves force water to flow in only one direction. Water can get trapped in the pipes for a period of time before being flushed out.