The total cost of the damage to Stafford Township’s water-sewer infrastructure is $1.135 million, originally paid by way of emergency resolution, but from here on to be financed by bonds repaid over time. The governing body adopted the bond ordinance on first reading at the meeting of April 2, to allow the cost to be spread out over the life of the bond.