By the end of the month, Ship Bottom hopes to have infrastructure repaired at the site of a sewer main break on Central Avenue between 24th and 25th streets. The break occurred last month, and as repairs were being made, it was discovered the site also had “issues with the water mains,” said Borough Administrator Bryan Geoghegan.

“These pipes are all fairly old, and they’re going to break sooner or later,” he said.