Travelers on Route 9 through Eagleswood Township have watched the progress of utility work in preparation for replacing the bridge over the Westecunk Creek. First, utility workers, contracted by Atlantic City Electric, dug four huge holes along the northbound side of the roadway and screwed large, threaded culverts into the ground. Then four 100-foot-high laminated wood telephone poles, about the width of three regular poles, were erected and finally fitted with wire last week.